Home on Tennessee Creek No Longer Threatened by Back Yard Shoreline Soil and Land Erosion
Project Name
Ross Residence on Possum Creek, a tributary of the Tennessee River #115
Customer Name
The Ross Family
Design / Specifying Engineer
Design/Build
Block Manufacturer
Bradley Tank and Pipe, LLC in Cleveland, TN
Wall Installer
Chattanooga Hardscapes
Project Location
Soddy Daisy, Tennessee
Year Built
2010
Project Scope
By Tyler White, President of Chattanooga Hardscapes
When Barry Ross' family purchased a home on Possum Creek near Chattanooga, Tennessee, Barry knew the shoreline needed some work. The existing retaining wall (part brick, part railroad tie) was rotting and crumbling away, exposing the shoreline to wave action and boat wakes. Every year, more of the Ross' yard was lost to the lake and in 2009, it was time to tackle the erosion issue once and for all.
My business, Chattanooga Hardscapes, specializes in retaining walls—primarily on residential projects. When Barry contacted us and we came on site, the old cross tie wall was about 50 percent gone and had allowed extensive erosion of the yard. Over the years, the ties had fallen into the river and the erosion just kept getting worse. While the erosion wasn't a threat to the house, it was unsightly and the owner wanted to prevent additional erosion of his property.
Initially, we considered going with a 125 lb. stacking block that had been used by several adjacent properties, but the blocks weren't available in the area anymore. The next available size was an 85 lb. block, but Barry wanted to be absolutely certain the wall would not need replacing in the near future. When I saw the scope of this project, I recommended using 2,500 lb. Redi-Rock blocks. I had seen Redi-Rock used in several shoreline protection projects in the past and I knew that the scale of the system basically guaranteed that the wall would never move. That's a definite plus at a site that has seen at least two retaining wall failures in the past.
In addition to building a new retaining wall, the homeowner wanted a system that would allow him to integrate a new dock as well. The wall design called for about 270 Redi-Rock blocks which would stretch along the property's edge—a distance of approximately 200 ft.
Barry took care of the permitting process through the Tennessee Valley Authority (TVA). TVA Act 26A governs construction on the shoreline of the Tennessee River and its tributaries. It was an extremely wet winter here in Tennessee, so we began construction in January of 2010 when the water levels were the lowest of the year.
Bradley Tank and Pipe, the local Redi-Rock manufacturer, helped design the project and determined that the wall could be built as a gravity structure due to the massive scale of the blocks.
Using Redi-Rock cut down on our installation time significantly, because the one-ton blocks are set by machines rather than by hand. At 7.5 ft. tall, the wall didn't require reinforcement, which also minimized the amount of excavation the project required and the time. Our crew consisted of myself and one installer and our equipment included a mini excavator and a skid steer loader.
To begin construction, we installed a one ft. deep gravel footing before installing the first course of blocks, which were buried according to Bradley Tank and Pipe's design. The wall site was a challenge to access; we had to unload the blocks from the delivery truck using the skid steer, then haul them about 300 yards through the woods on a trail we cleared to the staging area. We would line up ten to 15 blocks, and then and I would begin maneuvering the blocks into place using the excavator. The installer was attaching the lift chain to the blocks and guiding them into place.
After we installed the footing and first course of blocks, a very heavy rainstorm caused the water level to rise about six feet over the top of the blocks—which made us a little concerned for the stability of the wall since it wasn't yet finished. When the water level finally dropped again though, the wall hadn't settled even a fraction of an inch; we were very pleased.
The design called for a foot of gravel backfill behind the wall, but in some places we put in up to 5 ft. of gravel based on how much soil had eroded. We wrapped permeable fabric behind the gravel backfill, under the footer and against the back of the blocks to help ensure that the drain stone could do its job.
The wall only took us about 23 working days to install—but due to rain delays, those 23 days were spread over the course of two months. This was our first Redi-Rock wall, but it was easy to install because it's like stacking Legos—really big Legos. That made it fun and easy to work with and we enjoyed the process a lot.
After the entire wall was up, we installed rip rap along the base for the entire length of the wall and wrapped it around the ends of the wall about three feet.
"We've had very favorable comments from neighbors and friends since the new wall was finished," Barry said. "And of course it improves the neighborhood by replacing the unsightly wall that was there previously."
Design Manual
The Redi-Rock Design Resource Manual is an invaluable resource for any engineer or architect designing a Redi-Rock wall.
Download the Redi-Rock Design Resource Manual today! Due to large file sizes, we've split the DRM into several sections which you can download here:
Gravity Walls: 41"_ 60"_ 9" Setback
Reinforced Walls: 28" Series and PC System
Case Studies
Amphitheaters (2)
Bridges & Culverts (10)
- IN Historic Bridge Restoration
- Ledgestone Headwalls Protect Wetlands
- Abutments: OH Gravity Walls Protect Bridge
- Fast Abutment Installation in TN
- Abutments: OH Ledgestone Walls Install Fast
- Nova Scotia Bridge, Amphitheater
- UT Winding Mountain Bridge
- Gravity Abutments for Private Bridge
- Ski Resort Wing Walls, Retention Pond
- Wing Walls: OH Gravity Walls
DOT Jobs (11)
- Walls Solve MS DOT Right of Way Issue
- Tenn. DOT Highway Construction
- DOT Retaining Wall on the Ohio River
- Freestanding Walls for Freeway Landscape
- 9" Setback Walls for MI Road Construction
- Quick DOT Rest Area Construction
- Erosion Control Wall in Washington DC
- Aesthetic DOT Gravity Wall in VT
- CO DOT Chooses 13' Redi-Rock Wall
- Shoreline Erosion Control for Road Construction
- Reinforced DOT Wall in MA
Military (4)
- Shoreline: Veterans Park Construction
- US Army Mosque Training Facility
- Weapons Testing Range
- Buffalo VA Hospital
National Accounts (9)
- Walls for Hospital Parking Expansion
- Railway Construction and Maintenance
- Railway Construction in West Virginia
- Cobblestone Parking Lot Construction
- Home Depot Maximizes Space
- Home Depot Gravity Wall
- McDonald's Saves on Wall
- Costco Revitalizes Parking Area
- Gravity Walls Mazimize Wendy's Parking
Other (2)
Parks (10)
- Baseball Sports Complex Design
- Shoreline: Veterans Park Construction
- Shoreline: OH Island Erosion Solution
- Channel: Tulsa Stormwater Drainage System
- Private Club Pool Foundation and Wall
- Channel: Protecting Park from Creek Erosion
- Marina: Mackinac Island Harbor
- DOT Retaining Wall on the Ohio River
- Outdoor Stage with Columns
- Nova Scotia Bridge, Amphitheater
Railroads (3)
- Railway Construction and Maintenance
- Railway Construction in West Virginia
- Chicago Train Track Reinforcement
Residential (14)
- Shoreline: Vancouver Island Sea Walls for Home
- Ledgestone Retaining, Freestanding for KY Home
- Back Yard Landscaping Emergency
- Shoreline: ID Wall Prevents Erosion at Home
- Shoreline: TN River Home Erosion Control
- Channel: KY Stormwater Drainage
- Shoreline: IN Ledgestone Walls Protect Home
- Shoreline: MI Home Reinforced Walls
- Beautiful Residential Estate Retaining Wall
- Shoreline: Erosion Control for WA Home
- Custom Tennis/Basketball Court for Home
- Tall Walls, Spiral Staircase
- Shoreline: TX River Flood Protection
- Shoreline: MT Home Stops Shore Erosion
Road Construction (16)
- Gravity Wall Stops Cemetery/Road Erosion
- WA City Reduces Right of Way
- Ledgestone Wall for Road and Street Construction
- Ledgestone Wall for Highway Construction
- 19.5 Ft. Ledgestone Gravity Wall in Cinci
- Cobblestone Masonry Wall Restoration
- Ledgestone Headwalls Protect Wetlands
- Tenn. DOT Highway Construction
- DOT Retaining Wall on the Ohio River
- UT Winding Mountain Bridge
- Freestanding Walls for Freeway Landscape
- Walls for Hospital Parking Expansion
- Shopping Development Retaining Wall
- Quick DOT Rest Area Construction
- Erosion Control Wall in Washington DC
- Ski Resort Wing Walls, Retention Pond
Sports Complexes (4)
- Baseball Sports Complex Design
- NE Patriots Stadium/Shopping Center
- Custom Tennis/Basketball Court for Home
- U of Idaho Stadium Access Walls
Water Applications (26)
- Abutments: OH Gravity Walls Protect Bridge
- Abutments: OH Ledgestone Walls Install Fast
- Channel: Tulsa Stormwater Drainage System
- Channel: Tulsa Downtown Storm Solution
- Channel: NE City Reduces Flooding
- Channel: CO River Diversion
- Channel: KY Stormwater Drainage
- Channel: Protecting Park from Creek Erosion
- Marina: Mackinac Island Harbor
- Marina: Erosion Control for 31 Acre Marina
- Marina: Peecast Walls Replace Failing Wood
- Pump Station: Intake Structure Walls
- Retention Pond: OH Park Pond/Bridge
- Shoreline: Vancouver Island Sea Walls for Home
- Shoreline: IN Ledgestone Walls Protect Home
- Shoreline: ID Wall Prevents Erosion at Home
- Shoreline: Veterans Park Construction
- Shoreline: OH Island Erosion Solution
- Shoreline: TN River Home Erosion Control
- Shoreline: MI Home Reinforced Walls
- Shoreline: Walls Protect Power Plant
- Shoreline: Erosion Control for WA Home
- Shoreline: TX River Flood Protection
- Shoreline: Branson Sea Walls
- Shoreline: MT Home Stops Shore Erosion
- Wing Walls: KS Walls Protect Dam