Engineers Choose Redi-Rock Channel For CO River Diversion

Project Name

Upper Colorado River Recovery Implementation Program

Customer Name
Bureau of Reclamation

Design / Specifying Engineer
Charlie Larson, P.E.

Block Manufacturer
Grand Junction Pipe & Supply

Project Location
Palisade, CO

Year Built
2007

Project Scope

This award-winning Bureau of Reclamation project required the entire Colorado River to be diverted for six months to allow construction of fish ladders.

The Price-Stubb Dam near Palisade, Colorado was constructed in 1911 to divert water into canals for irrigation. The concrete roller dam is 325 feet wide and eight feet high, spanning the width of the river. Though no longer in use, the dam has been blocking the upstream migration of several endangered species of fish including humpback chubs, bonytails and Colorado pike minnows. The goal of the fish ladders is to create a pool and drop effect that would allow fish to rest on their upstream migration in hopes of improving fish population in the river.

The project was designed by Charlie Larson, P.E., hydrology/hydraulics engineer with Kleinfelder Engineering’s Surface Water Resources Program. An existing though unused canal acted as the framework to divert the river to allow the fish ladders to be installed. The canal had been filled in after a landslide more than 30 years ago.

"As with many construction projects, there were some surprises," Larson wrote in an article published in the August 2008 issue of U.S. Water News. "During the excavation of the diversion channel, crews discovered existing canal feature that required timely design modifications, including the discovery of an existing stacked rock wall along the right side of the diversion immediately downstream of the headworks and situated on a 2.5-ft-high concrete pony wall."

Engineers performed stability analyses of the existing 19 ft.-high stacked rock wall and designed a shoring system to stabilize the design.

"The canal had some tight constraints. We didn’t have room to put in a slope, so we needed an MSE to stabilize the canal," Larson said. At the suggestion of Kissner General Contracting, Redi-Rock was chosen for the MSE wall the canal required.

Kleinfelder engineers selected a design flow and consulted Redi-Rock design charts and did their own analysis to confirm that Redi-Rock’s 28 in. reinforced wall could withstand the force of the water. Due to an existing feature, the length of geogrid extending behind the block had to be shortened from 13-15 feet to 8-10 ft. To compensate, engineers designed the wall with a wedge piece under the base course of blocks so that the wall tilts back, giving it a 10 degree setback instead of the standard 4 degree setback on a 28 in. series wall.

Robby Lewis of Redi-Rock producer Grand Juntion Pipe and Supply explained that Redi-Rock was used to "armor plate" a curve in the diversion channel to prevent erosion.

The river is diverted into the canal and directed into a 21 ft. high Redi-Rock retaining wall that was 200 ft. long. The wall was a radius but turned 90 degrees.

"It worked out really well," Larson said. "We were impressed with how Redi-Rock performed and have specified it on another project since this one was completed."

The project also utilized Redi-Rock to create two temporary bridge abutments for a construction access bridge. The bridge was constructed using 41 in. series blocks. Redi-Rock was also used to create a platform from which cement trucks could pour the concrete into the forms that created the fish ladders. The trucks could drive up and pour their concrete into the forms below without necessitating pump trucks, saving time and money.

When the river channel was clear, construction of the 600 ft. long passage commenced. Larson explains that "190 concrete cylinders [were] placed in a chevron pattern of 38 baffle arrangements consisting of five cylinders each. The center cylinders are spaced 15 ft. apart along the fish ladder. These provide a cascading effect of pool and drop that allow fish a chance at resting on their upstream migration."

This project was the recipient of the 2008 Golden Hardhat Award for Outstanding Environmental Project. The award is sponsored by Colorado Construction Magazine and honors the best construction projects in Colorado each year.

Design Manual

Find us on Facebook and share your landscape photos with us!
Join our group on LinkedIn to ask and answer questions about big block retaining walls!

Case Studies

Amphitheaters (2)

Bridges & Culverts (10)

DOT Jobs (11)

Military (4)

National Accounts (9)

Other (2)

Parks (10)

Railroads (3)

Residential (14)

Road Construction (16)

Sports Complexes (4)

Water Applications (26)