School Construction In Connecticut Historic District
Project Name
Bridges School Early Childhood Development Center #105
Customer Name
Bridges School Early Childhood Development
Design / Specifying Engineer
Souhegan Valley Engineering, Inc.
Block Manufacturer
Redi-Rock Walls of New England-Connecticut Division
Wall Installer
Carrier Wall Systems
Project Location
Greenwich, CT
Year Built
2008
THE CHALLENGE:
When the Bridges School Early Childhood Program of Greenwich, Connecticut purchased land in 2008, they had big plans for it. This parcel included a vacant historic gable building that was one of the town's first elementary schools and later a community center. The small, progressive early childhood program had outgrown its current facility and moved forward to restore, renovate and return this historic building to the community as a school for young children. To renovate the historic site, though, was no easy task.
The historic building had only foot access - no driveway and no parking. The property included grade changes that needed to be leveled in order to create enough room for the school grounds and the parking area behind the school.
The back property line proved to be the most difficult area of the site. In order to create enough room for the school's parking lot, a 15 ft. high retaining wall needed to be built within 7-7.5 ft. of the property line with. To make the site even more challenging, the property above the proposed retaining wall had a swimming pool sitting very close to the property line.
Greenwich, Conn. is a historic town, and as such most retaining walls are built from natural quarried stone. For this difficult wall, though, natural stone could not be engineered to construct a 15 ft. high gravity wall. The engineers needed a system that could meet these requirements, but also match the historic look of the town.
THE SOLUTION:
This is where Redi-Rock fit in. Redi-Rock is a wet-cast concrete wall system that combines the structural stability of an engineered concrete blocks with the color and texture of natural stone. Redi-Rock's massive one ton blocks interlock, harnessing the power of gravity to allow the construction of taller walls that often don't require reinforcement. This allows walls to be built closer to property lines--in turn saving valuable space for developments like the Bridges School. Redi-Rock also saved the school about 50 percent of what a natural stone wall would have cost.
"It's really stable and looks nice. We certainly liked the product," said general contractor and part owner of the school, Dick Williamson. Williamson's wife Connie is the founder and co-owner of Bridges School and is also a teacher there.
In order to obtain the necessary permission to build the wall, Carrier Wall Systems' owner and registered engineer Johnny Carrier presented the Redi-Rock solution to the Greenwich Historic District Commission. The Commission reviews proposed changes to structures and landscapes within the Historic Districts and promotes the preservation of historic structures and landscapes. As part of this effort, the commission is often opposed to allowing retaining walls other than natural stone walls to be constructed within the Historic District.
As a P.E., Carrier was not worried about presenting the structural benefits of the Redi-Rock solution - "that was the easy part," he said. The hard part was finding a creative way to show the commission how natural the walls could look. Faced with this challenge, Carrier collected two rock samples with different colors from the area near the school and returned to his shop. There, his team created concrete stain colors that replicated the natural stone colors. Carrier took these color samples along with the natural stones to the historic commission meeting where he presented the Redi-Rock solution.
"They were surprised at how closely we were able to match the colors," Carrier said.
The approval process took about two and a half years, but the commission eventually approved the wall.
THE CONSTRUCTION:
When construction began, Carrier's crew discovered that ground was glacial till and bedrock, which required additional geotechnical engineering analysis and delayed construction. When construction finally resumed right before Christmas in 2008, the entire 2500 sq. ft. wall went up in about 10 days.
Because the wall had to be built in such a narrow space and excavation behind the wall was limited due to the pool above, reinforcing the wall using geogrid was not an option. Therefore, the wall was designed as a gravity wall, utilizing Redi-Rock's 60 in blocks in the bottom two courses of the wall as well as in a middle course of the wall. The glacial till and bedrock had to be chipped out and hauled away, keeping in mind the pool directly above the wall. The design also called for two planter blocks which increased the setback of the wall and further increased stability. The slope above the wall was too steep to vegetate and was stabilized by layering flat stone.
THE OUTCOME:
In the spring of 2009, Carrier's crews returned to the site and stained the wall to help it match the natural stone coloring of the area.
"They did a nice job of staining the concrete. We'd recommend Redi-Rock very highly to anyone considering retaining walls," Dick Williamson said.
The school was scheduled to open its new facility in early 2010. With the Redi-Rock retaining wall providing adequate parking and natural-looking support for the slope behind the school, the owners of the project are excited to celebrate the grand opening of the school.
Design Manual
The Redi-Rock Design Resource Manual is an invaluable resource for any engineer or architect designing a Redi-Rock wall.
Download the Redi-Rock Design Resource Manual today! Due to large file sizes, we've split the DRM into several sections which you can download here:
Gravity Walls: 41"_ 60"_ 9" Setback
Reinforced Walls: 28" Series and PC System
Case Studies
Amphitheaters (2)
Bridges & Culverts (10)
- IN Historic Bridge Restoration
- Ledgestone Headwalls Protect Wetlands
- Abutments: OH Gravity Walls Protect Bridge
- Fast Abutment Installation in TN
- Abutments: OH Ledgestone Walls Install Fast
- Nova Scotia Bridge, Amphitheater
- UT Winding Mountain Bridge
- Gravity Abutments for Private Bridge
- Ski Resort Wing Walls, Retention Pond
- Wing Walls: OH Gravity Walls
DOT Jobs (11)
- Walls Solve MS DOT Right of Way Issue
- Tenn. DOT Highway Construction
- DOT Retaining Wall on the Ohio River
- Freestanding Walls for Freeway Landscape
- 9" Setback Walls for MI Road Construction
- Quick DOT Rest Area Construction
- Erosion Control Wall in Washington DC
- Aesthetic DOT Gravity Wall in VT
- CO DOT Chooses 13' Redi-Rock Wall
- Shoreline Erosion Control for Road Construction
- Reinforced DOT Wall in MA
Military (4)
- Shoreline: Veterans Park Construction
- US Army Mosque Training Facility
- Weapons Testing Range
- Buffalo VA Hospital
National Accounts (9)
- Walls for Hospital Parking Expansion
- Railway Construction and Maintenance
- Railway Construction in West Virginia
- Cobblestone Parking Lot Construction
- Home Depot Maximizes Space
- Home Depot Gravity Wall
- McDonald's Saves on Wall
- Costco Revitalizes Parking Area
- Gravity Walls Mazimize Wendy's Parking
Other (2)
Parks (10)
- Baseball Sports Complex Design
- Shoreline: Veterans Park Construction
- Shoreline: OH Island Erosion Solution
- Channel: Tulsa Stormwater Drainage System
- Private Club Pool Foundation and Wall
- Channel: Protecting Park from Creek Erosion
- Marina: Mackinac Island Harbor
- DOT Retaining Wall on the Ohio River
- Outdoor Stage with Columns
- Nova Scotia Bridge, Amphitheater
Railroads (3)
- Railway Construction and Maintenance
- Railway Construction in West Virginia
- Chicago Train Track Reinforcement
Residential (14)
- Shoreline: Vancouver Island Sea Walls for Home
- Ledgestone Retaining, Freestanding for KY Home
- Back Yard Landscaping Emergency
- Shoreline: ID Wall Prevents Erosion at Home
- Shoreline: TN River Home Erosion Control
- Channel: KY Stormwater Drainage
- Shoreline: IN Ledgestone Walls Protect Home
- Shoreline: MI Home Reinforced Walls
- Beautiful Residential Estate Retaining Wall
- Shoreline: Erosion Control for WA Home
- Custom Tennis/Basketball Court for Home
- Tall Walls, Spiral Staircase
- Shoreline: TX River Flood Protection
- Shoreline: MT Home Stops Shore Erosion
Road Construction (16)
- Gravity Wall Stops Cemetery/Road Erosion
- WA City Reduces Right of Way
- Ledgestone Wall for Road and Street Construction
- Ledgestone Wall for Highway Construction
- 19.5 Ft. Ledgestone Gravity Wall in Cinci
- Cobblestone Masonry Wall Restoration
- Ledgestone Headwalls Protect Wetlands
- Tenn. DOT Highway Construction
- DOT Retaining Wall on the Ohio River
- UT Winding Mountain Bridge
- Freestanding Walls for Freeway Landscape
- Walls for Hospital Parking Expansion
- Shopping Development Retaining Wall
- Quick DOT Rest Area Construction
- Erosion Control Wall in Washington DC
- Ski Resort Wing Walls, Retention Pond
Sports Complexes (4)
- Baseball Sports Complex Design
- NE Patriots Stadium/Shopping Center
- Custom Tennis/Basketball Court for Home
- U of Idaho Stadium Access Walls
Water Applications (26)
- Abutments: OH Gravity Walls Protect Bridge
- Abutments: OH Ledgestone Walls Install Fast
- Channel: Tulsa Stormwater Drainage System
- Channel: Tulsa Downtown Storm Solution
- Channel: NE City Reduces Flooding
- Channel: CO River Diversion
- Channel: KY Stormwater Drainage
- Channel: Protecting Park from Creek Erosion
- Marina: Mackinac Island Harbor
- Marina: Erosion Control for 31 Acre Marina
- Marina: Peecast Walls Replace Failing Wood
- Pump Station: Intake Structure Walls
- Retention Pond: OH Park Pond/Bridge
- Shoreline: Vancouver Island Sea Walls for Home
- Shoreline: IN Ledgestone Walls Protect Home
- Shoreline: ID Wall Prevents Erosion at Home
- Shoreline: Veterans Park Construction
- Shoreline: OH Island Erosion Solution
- Shoreline: TN River Home Erosion Control
- Shoreline: MI Home Reinforced Walls
- Shoreline: Walls Protect Power Plant
- Shoreline: Erosion Control for WA Home
- Shoreline: TX River Flood Protection
- Shoreline: Branson Sea Walls
- Shoreline: MT Home Stops Shore Erosion
- Wing Walls: KS Walls Protect Dam